The wall lining has just arrived. It looks very nice.
I have brought the insulation tanks in to heat up ready for a big day of construction tomorrow. I need to get them up to 25C before use.
I am prepping the sliding door today and filling in any gaps between the wood and the metal as the carpet is a lot more malleable than I thought it would be. Any imperfections behind the carpet will show up.
I can’t wait till tomorrow now. I will have my new kitchen worksurface and hob/sink fitted. The sliding door will be fully insulated, panelled and lined and the roof insulation will be completed finally.