Originally I planned to only have the shower/tap in the bathroom. I did it this way to keep the plumbing as simple as possible.
However soon after installation I realised that the shower is not a good place to get water for teeth brushing and it is a pain having to get a cup of fresh water from the kitchen each time.
So today I decided to install the old kitchen tap in the bathroom sink. What I hadn’t realised is that I had built the shower room too solidly and it has taken me two hours to get the pipes routed in. However I now have it all installed and just need to drain the water system to install the T Pieces for the supply.
The waste pipe is causing me a little concern as well as it popped out when I pulled the sink unit out and I can’t be certain it is fully sealed again. I am taking a 10 minute break and will go back and re do that and drain the system etc.
I also managed to get some of the trim in between the roof and the wall. As it is not 90 Degrees it took a lot of messing about on the chop saw to get the angle right but It looks reasonable now and once the wall lining is on it will look fine.